The Cost of Re-Staking (sometimes it includes embarrassment)
Years ago, as a young construction surveyor, I attended the weekly safety meetings on a 12 acre commercial job site. I had been surveying on-site everyday for the previous six months. I had been doing a lot of free re-staking because the guys were cool and I wanted to be accepted as “one of the [...]
February 27, 2009 in Paul's Blog
Tags: Grade staking, Machine Control, Staking | No Comments »